Cabinetry Installation in Tacoma and South Puget Sound

Kitchen and bath installs, refacing and built-ins.

Licensed BESTPPC752LD$30,000 bondedInsuredFree estimatesSe habla español

The situation

What you're actually dealing with

Cabinet installation is a levelling and scribing job. Cabinets arrive square, houses are not, and the entire quality of the finished kitchen comes down to how carefully the boxes are shimmed, levelled and fastened before a single door is hung.

This matters more in older housing stock than anywhere else. Walls in a home built in the 1940s are rarely plumb and floors are rarely flat, which means a run of cabinets set without proper shimming will show it immediately: doors that will not align, gaps at the ceiling, and a countertop that cannot sit flat.

Best Pro installs cabinetry you have purchased, or supplies and installs it. Either way the boxes get set level and fastened into framing, not into drywall.

Public record

Verify with L&I
WA contractor license
BESTPPC752LD
Construction Contractor, General · Active · UBI 605 604 724
Contractor bond
$30,000
The North River Insurance Company · double the $15,000 a specialty contractor carries
General liability
$1,000,000
State National Insurance Company Inc · four times the $250,000 state minimum

Scope

What a typical job includes

This is the standard scope. Yours is written out and agreed before anything starts.

  • Removal and disposal of existing cabinetry where applicable
  • Wall and floor assessment for level, plumb and square before layout
  • Layout and level line established across the full run
  • Upper and base cabinet installation, shimmed and fastened into framing
  • Scribing to walls, ceilings and floors for tight finished joints
  • Filler, trim, toe kick, crown and light rail installation
  • Door and drawer alignment across the whole run
  • Hardware installation
  • Coordination with countertop templating and install

Cost

What drives the price

Best Pro does not publish price ranges, because a number posted on a website has to ignore everything that actually makes your job cost what it costs. Here is what a quote is built from instead.

  • The number of cabinet boxes and the total linear footage of the run
  • Whether existing cabinets have to be removed and disposed of
  • How far out of level and plumb the walls and floors are, which drives scribing labor
  • Crown, light rail, fillers and other trim detail
  • Whether plumbing or electrical has to be relocated for a layout change
  • Countertop coordination and any required cabinet modification for sinks or appliances

The free estimate covers all of it: an on-site walkthrough, a written scope, and a firm number you can compare against anyone else's.

Get my free estimate

Process

How a cabinetry job runs

  1. Step 1

    Measure and layout review

    We check the field measurements against the cabinet order before demolition, because a layout problem found on paper costs nothing and one found on install day costs a week.

  2. Step 2

    Demolition

    Existing cabinets out, walls patched, and any plumbing or electrical that needs to move identified and coordinated.

  3. Step 3

    Layout lines

    Level lines struck around the room from the high point of the floor, and studs located and marked. This step is what everything else hangs on.

  4. Step 4

    Install

    Uppers first, then bases, each one shimmed and scribed, fastened into framing and joined to its neighbor.

  5. Step 5

    Countertop coordination

    Once the bases are set and level, the countertop fabricator can template. We coordinate that timing so you are not waiting on it.

  6. Step 6

    Trim, doors and hardware

    Fillers, toe kick, crown and light rail, then every door and drawer front aligned across the run and hardware set.

Options

Materials and choices

Straight guidance on what suits this climate and this housing stock, including where the cheaper option is genuinely fine.

New cabinet installation
Stock, semi-custom or custom boxes. We install what you have bought or help you specify it.
Cabinet refacing
New doors, drawer fronts and veneer over sound existing boxes. A fraction of the cost and disruption of a full replacement, and the right answer when the layout works and the boxes are solid.
Cabinet painting
Properly prepped and sprayed, this transforms a dated kitchen for far less than replacement. Prep is everything and it is not a weekend job.
Built-ins and vanities
Bathroom vanities, laundry and mudroom storage, closet systems and built-in shelving.

Questions

Cabinetry questions, answered

Yes. Best Pro Contractors installs cabinetry purchased from any supplier. Field measurements are checked against your order before demolition begins so that any ordering problem is caught early.

Get a free cabinetry estimate

Tell us what you need and Alberto gets back to you within 24 hours. Estimates are free and there is no obligation.

Free estimates, no obligation, and se habla español.