Skip to content
Best Pro Contractors

Deck Building and Repair in Tacoma and South Puget Sound

New builds, rebuilds and structural repair, composite or wood.

Licensed BESTPPC752LD$30,000 bondedInsuredFree estimatesSe habla español

The situation

What you're actually dealing with

A deck is a structure before it is an amenity. The footings, the ledger connection to the house and the framing underneath determine whether it is safe, and the decking surface you walk on is the last and least important part of it.

In this climate decks fail from the bottom up. Joists stay damp, the ledger flashing behind the boards gives way, and fasteners corrode where they sit in standing water. A deck can look fine from above while the ledger connection holding it to the house has been rotting quietly for years. That connection is the single most common cause of deck collapse.

Whether we are building new or repairing what you have, the structure gets inspected and addressed first. If your deck only needs new surface boards, Best Pro will tell you that instead of selling you a rebuild.

Public record

Verify with L&I
WA contractor license
BESTPPC752LD
Construction Contractor, General · Active · UBI 605 604 724
Contractor bond
$30,000
The North River Insurance Company · double the $15,000 a specialty contractor carries
General liability
$1,000,000
State National Insurance Company Inc · four times the $250,000 state minimum

Scope

What a typical job includes

This is the standard scope. Yours is written out and agreed before anything starts.

  • Assessment of existing footings, framing, ledger and fasteners
  • Properly sized and placed concrete footings for new construction
  • Pressure-treated framing with joist spacing set for the decking material
  • Correctly flashed ledger attachment to the house
  • Structural fasteners and hardware rated for exterior and treated lumber
  • Decking installation in composite or wood
  • Railing, stairs and guard construction to code height and spacing
  • Permit coordination where the height or size of the deck requires it
  • Site cleanup and haul-away of demolition material

Cost

What drives the price

Best Pro does not publish price ranges, because a number posted on a website has to ignore everything that actually makes your job cost what it costs. Here is what a quote is built from instead.

  • Square footage, height above grade, and whether stairs are involved
  • Decking material, since composite and wood are meaningfully different budgets
  • The number and depth of footings, which depend on soil and span
  • Railing type and total linear footage
  • Whether an existing deck can be reframed or has to come out entirely
  • Permitting requirements for the deck's height and size in your jurisdiction

The free estimate covers all of it: an on-site walkthrough, a written scope, and a firm number you can compare against anyone else's.

Get my free estimate

Process

How a decks job runs

  1. Step 1

    Site visit and design

    We look at the space, the door threshold, the grade and how you actually intend to use the deck, then size it accordingly. Bigger is not automatically better.

  2. Step 2

    Written scope and permitting

    Materials, framing plan and railing detail in writing. Decks above a certain height need a permit, and we confirm the requirement with your jurisdiction before scheduling.

  3. Step 3

    Demolition or excavation

    The old deck comes out, or the footing locations get dug and poured for a new build.

  4. Step 4

    Framing

    Ledger flashed and fastened, beams and joists set, everything checked for level and span before a single deck board goes down.

  5. Step 5

    Decking, rail and stairs

    Surface boards, then railing, guards and stair treads. Fastener pattern kept consistent and hidden where the product allows.

  6. Step 6

    Walkthrough

    We walk the finished deck with you, including the parts you cannot see, so you know what is underneath it.

Options

Materials and choices

Straight guidance on what suits this climate and this housing stock, including where the cheaper option is genuinely fine.

Composite decking
The practical answer for most homes in the south Sound. It does not need annual sealing, it does not splinter, and it holds up to a climate that keeps a deck surface wet for half the year. Higher cost up front, far less maintenance.
Pressure-treated wood
The lowest-cost surface and still a legitimate choice. It requires cleaning and sealing every year or two in this climate to avoid checking and greying.
Cedar
Better looking than treated lumber and naturally rot-resistant, at a middle price. It still needs regular finishing to hold its color here.
Railing
Wood, composite, or metal and cable. Cable and metal keep sightlines open, which matters if the deck looks out at anything worth looking at.

Questions

Decks questions, answered

Permit requirements depend on the deck's height above grade, its size, and whether it is attached to the house. Requirements differ between the City of Tacoma, unincorporated Pierce County and the other jurisdictions in the service area. Best Pro Contractors confirms the requirement with your jurisdiction as part of the written quote.

Get a free decks estimate

Tell us what you need and Alberto gets back to you within 24 hours. Estimates are free and there is no obligation.

Free estimates, no obligation, and se habla español.

CallGet estimate